Current Project
No. | Project Tittle | Client/ Maincon | Awarded Year |
---|---|---|---|
1 | Bored Pile Works @ Choa Chu Kang N8C12 (HDB) | Welltech Construction Pte Ltd | 2023 |
2 | Bored Pile Works @ Institution Hill (Hillhouse) | HLBC Pte Ltd | 2023 |
3 | Bored Pile Works @ Tengah C3 & C7 (HDB) | Obayashi Singapore Pte Ltd | 2023 |
4 | Bored Pile Works @ Choa Chu Kang N6C5A (HDB) | Hexacon Construction Pte Ltd | 2023 |
5 | Bored Pile Works @ Yishun N9C3 (HDB) | Debenho Pte Ltd | 2022 |
6 | Bored Pile Works at Contract N103 (LTA) | Leighton Contractors (Asia) Limited (SingaporeBranch) & Yongnam Engineering & Construction(Private) Limited Joint Venture | 2022 |
7 | Bored Pile Works at Contract J101 (LTA) | China Railway 11 Bureau Group Corporation(Singapore Branch) | 2022 |
8 | Bored Pile Works at Contract J112 (LTA) | China Civil Engineering Construction CorporationBranch Singapore - SCB Building Construction PteLtd Joint Venture | 2022 |
9 | Bored Pile Works for Residential Development at 8 Lorong 25A Geylang | Exclusive Design Construction Pte Ltd | 2022 |
10 | Bored Pile Work at HDB Central Area Contract C7 (HDB) | CNQC Engineering & Construction Pte. Ltd. | 2022 |
11 | Contiguous Bored Pile Works at Contract N109 (LTA) | United Singapore Builders Pte Ltd | 2022 |
12 | Contiguous Bored Pile & King Post Work at DTSS2 - Contract T07 (PUB) | Ed Zublin A G | 2022 |
13 | Bored Pile Works for HDB Kallang/Whompoa Contract C59 (HDB) | Pal-Link Construction Pte Ltd | 2022 |
Completed Project
The past projects that we had completed includes project from both private and public sector.
No. | Project Title | Client/ Maincon | Awarded Year |
---|---|---|---|
1 | Contiguous Bored Pile & Bored Pile Works for Sewer Shaft at Changi East (PUB) | Hung Yao Sheng Engineering Pte Ltd | 2022 |
2 | Bored Pile & King Post Work for Pumping Station at Seletar North Link (PUB) | Chye Joo Construction Pte Ltd | 2022 |
3 | Bored Pile Works at 110 & 112 Killiney Road | Star Engineering Pte Ltd | 2022 |
4 | Bored Pile Work at Tampines N9C19 (HDB) | Precise Development Pte Ltd | 2022 |
5 | Bored Pile Work at T220 (LTA) | Tiong Seng Contractors (Pte) Ltd | 2022 |
No. | Project Title | Client/ Maincon | Awarded Year |
---|---|---|---|
1 | Bored Pile Work at Bishan C35a & C35b (HDB) | Welltech Construction Pte Ltd | 2021 |
2 | Bored Pile Work at Marina South Sub-Zone (Contract 2) (PUB) | Hung Yao Sheng Engineering Pte Ltd | 2021 |
3 | Bored Pile Work at Tuas C2B (PUB) | China Harbour (Singapore) Engineering Company Pte Ltd | 2021 |
4 | Bored Pile Work at Woodlands N3C16 (HDB) | BHCC Construction Pte Ltd | 2021 |
5 | Bored Pile Work at Woodlands N5C23 (HDB) | Ningbo Construction Group Co. Ltd (Singapore Branch) | 2021 |
6 | Bored Pile Work at Yishun Close @ Condominium | China Jingye Construction Engineering (S) Pte. Ltd. | 2021 |
7 | Bored Pile Work at Yishun Polyclinic (MOH) | H P Construction & Engineering Pte Ltd | 2021 |
8 | Secant & Bored Pile Work at 62-64 Waterloo Street @ Hotel Development | Fragrance Victory Pte Ltd | 2021 |
9 | Secant & Bored Pile Work at Sembawang N2C3-5 (HDB) | Precise Development Pte Ltd | 2021 |
10 | Secant Bored Pile Work at Apartment at Sophia Road | CNQC Engineering & Construction Pte. Ltd. | 2021 |
11 | Secant Bored Pile Work at Bulim (JTC) @ Advance Infrastructure Works | KTC Civil Engineering & Construction Pte Ltd Kok Tong Construction Pte Ltd | 2021 |
12 | Secant Bored Pile Work at DTSS T07 (PUB) @ Shaft LS1 | Ed. Zublin AG | 2021 |
No. | Project Title | Client/ Maincon | Awarded Year |
---|---|---|---|
1 | Bored Pile Work at DTSS T09 (PUB) @ Shaft N | Leighton Contractors (Asia) Limited (Singapore Branch) | 2020 |
2 | Bored Pile Work at Lorong 28 Geylang @ Noma Residences | HLBC Pte Ltd | 2020 |
3 | Bored Pile Work at Choa Chu Kang Avenue 1 @ 5 Storey Church w Attic & Basement | HP Construction & Engineering Pte Ltd | 2020 |
4 | Bored Pile Work at Telok Kurau Road @ Condominium | Pal – Link Construction Pte Ltd | 2020 |
5 | Bored Pile Work at Tampines N8C31 (HDB) | Chip Eng Seng Contractors (1988) Pte Ltd | 2020 |
6 | Bored Pile Work at Tengah Garden C65 (HDB) | HPC Builders Pte Ltd | 2020 |
7 | Bored Pile Work at DTSS T10 (PUB) @ Shaft M1 | Nishimatsu Construction Co. Ltd | 2020 |
8 | Bored Pile Work at No. 130, Joo Chiat Road @ A & A to Khalid Mosque | Hong Shin Builders Pte Ltd | 2020 |
9 | Bored Pile Work at 41 Senoko Way @ 4-Storey Building | Star Engineering Pte Ltd | 2020 |
10 | Bored Pile Work at DTSS T07 (PUB) @ Shaft LS5 | Ed. Zublin AG | 2020 |
11 | Bored Pile Work at 139 & 141 Holland Road @ Mooi Residences | East Asia Engineering & Construction Pte Ltd | 2020 |
No. | Project Title | Client/ Maincon | Awarded Year |
---|---|---|---|
1 | Bored Pile Work at DE122 (LTA) | Jin Choon Civil Engineering Pte Ltd | 2019 |
2 | Bored Pile Work at DE135 (LTA) | Jin Choon Civil Engineering Pte Ltd | 2019 |
3 | Bored Pile Work at A & A to Existing Funchun Primary School, Junyuan Primary School, New Town Primary School and North View Primary School under Peri Phase (Package 5C) (MOE) | BHCC Construction Pte Ltd | 2019 |
4 | Bored Pile Work at Yishun N3C25 (HDB) | LC&T Builder (1971) Pte Ltd | 2019 |
5 | Bored Pile Work at Tampines N9C18 (HDB) | Welltech Construction Pte Ltd | 2019 |
6 | Bored Pile Work at River Valley Road @ RV Altitude | Pal – Link Construction Pte Ltd | 2019 |
7 | Bored Pile Work at 2 & 4 Woodland Loop @ General Industrial Factory | Welltech Construction Pte Ltd | 2019 |
8 | Bored Pile Work at 1 Jalan Remaja | Rich-Link Builders Pte Ltd. | 2019 |
9 | Bored Pile Work at 66kV Substation @ Dairy Farm Walk | Chiu Teng Construction Co Pte Ltd | 2019 |
10 | Contigous Bored Pile Work at Pulau Brani | Hao Da Pte. Ltd. | 2019 |
11 | Bored Pile Work at Loyang Drive | KM Interior Work Pte Ltd. | 2019 |
12 | Bored Pile Work at 30 Quality Road | Exclusive Design Construction Pte Ltd. | 2019 |
No. | Project Title | Client/ Maincon | Awarded Year |
---|---|---|---|
1 | Bored Pile Work at DTSS T09 (PUB) @ Shaft N1,N2, O2 & O3 | Leighton Contractors (Asia) Limited (Singapore Branch) | 2018 |
2 | Bored Pile Work at Woodlands Hospital Campus* Labour (P1804) (MOH) | Penta-Ocean Construction Co., Ltd | 2018 |
3 | Bored Pile Work at T302-Relief Well Installation at T228 Interface Area)- P1803 (LTA) | China Railway First Group Co., Ltd | 2018 |
4 | Bored Pile Work at C886 Construction of Cut & Covel Tunnel @ Marina Bay for Circle Line 6 (LTA) | Koh Brothers Building & Civil EngineeringContractor Pte Ltd | 2018 |
5 | Bored Pile Work at Kheng Cheng School Project- P1802 (MOE) | Trust-Build Engineering & Construction Pte Ltd | 2018 |
6 | Bored Pile Work at 15 Arumugam Road (Chinese Temple) | CS Bored Pile System Pte Ltd | 2018 |
7 | Bored Pile Work at Woodland N7C27 (HDB) | Newcon Builders Pte Ltd | 2018 |
8 | Bored Pile Work at Chua Chu Kang N1C16 (HDB) | HP Construction & Engineering Pte Ltd | 2018 |
9 | Bored Pile Work at Sengkang N3C29 (Anchorvale Road/Anchorvale Street) (HDB) | Ken-Pal (S) Pte Ltd | 2018 |
No. | Project Title | Client/ Maincon | Awarded Year |
---|---|---|---|
1 | Bored Pile Work at 183 Upper Thomson Road | Trinity Construction Development Pte Ltd | 2017 |
2 | Bored Pile Work at T302 -23A Rhu Cross – P1704 (LTA) | China Railway First Group Co., Ltd | 2017 |
3 | Bored Pile Work at Woodlands Hospital Campus* Total Sub (MOH) | Civil Tech Pte Ltd | 2017 |
4 | Bored Pile Work at T302 -23A Rhu Cross – P1706 (LTA) | China Railway First Group Co., Ltd | 2017 |
5 | Bored Pile Work at Woodlands Hospital Campus* Labour (MOH) | Civil Tech Pte Ltd | 2017 |
6 | Bored Pile Work at T302-23A Rhu Cross – P1801 (LTA) | China Railway First Group Co., Ltd | 2017 |
7 | Bored Pile Work at Marina East Drive/ DFC – P1705 (PUB) | Koh Brothers Building & Civil Engineering Contractor Pte Ltd | 2017 |
No. | Project Title | Client/ Maincon | Awarded Year |
---|---|---|---|
1 | Bored Pile Work at ER403 Nicoll Highway (LTA) | Pintary Foundations Pte Ltd (Previously known as W Foundations Pte Ltd) | 2016 |
2 | Bored Pile Work at 3 Pioneer Sector Lane | Pintary Foundations Pte Ltd (Previously known as W Foundations Pte Ltd) | 2016 |
3 | Bored Pile Work at Cecil Street | Pintary Foundations Pte Ltd (Previously known as W Foundations Pte Ltd) | 2016 |
4 | Bored Pile Work at Chua Cho Kang Water Works (NTU) | Pintary Foundations Pte Ltd (Previously known as W Foundations Pte Ltd) | 2016 |
5 | Bored Pile Work at Bukit Timah Canal * Labour (PUB) | Pintary Foundations Pte Ltd (Previously known as W Foundations Pte Ltd) | 2016 |
6 | Bored Pile Work at T313 Samsung (Bedok) (LTA) | Pintary Foundations Pte Ltd (Previously known as W Foundations Pte Ltd) | 2016 |
7 | Bored Pile Work at SGH (P1634) * Labour | Pintary Foundations Pte Ltd (Previously known as W Foundations Pte Ltd) | 2016 |
No. | Project Title | Client/ Maincon | Awarded Year |
---|---|---|---|
1 | Bored Pile Work at Woodlands industrial Park E9 | Pintary Foundations Pte Ltd (Previously known as W Foundations Pte Ltd) | 2015 |
2 | Bored Pile Work at Robinson Tower | L&M Foundation Specialist Pte Ltd | 2015 |
3 | Bored Pile Work at Sembawang Way N3 C8 (HDB) | Ryobi Kiso (S) Pte Ltd | 2015 |
4 | Bored Pile Work at Sengkang N3C28 (Anchorvale Road) (HDB) | Ryobi Kiso (S) Pte Ltd | 2015 |
5 | Bored Pile Work at Bukit Merah RC53 (Labour) (HDB) | Ryobi Kiso (S) Pte Ltd | 2015 |
6 | Bored Pile Work at T205 – Woodlands South Station (LTA) | Pintary Foundations Pte Ltd (Previously known as W Foundations Pte Ltd) | 2015 |
7 | Bored Pile Work at Kallang Whampoa C21(St George’s Lane) (HDB) | Ryobi Kiso (S) Pte Ltd | 2015 |
8 | Bored Pile Work at T207 – Upper Thomson (LTA) | Pintary Foundations Pte Ltd (Previously known as W Foundations Pte Ltd) | 2015 |
9 | Bored Pile Work at Bukit Batok West Ave 8 (N4 C10&C11) (HDB) | Ryobi Kiso (S) Pte Ltd | 2015 |
10 | Bored Pile Work at Jurong Island to Pioneer Transmission Cable Tunnel (LTA) | Ryobi Kiso (S) Pte Ltd | 2015 |
11 | Bored Pile Work at Changi Airport Terminal 4 | Pintary Foundations Pte Ltd (Previously known as W Foundations Pte Ltd) | 2015 |
12 | Bored Pile Work at Geylang Methodist Primary School (MOE) | Pintary Foundations Pte Ltd (Previously known as W Foundations Pte Ltd) | 2015 |
13 | Bored Pile Work at T3003 – Bedok (LTA) | Pintary Foundations Pte Ltd (Previously known as W Foundations Pte Ltd) | 2015 |
14 | Bored Pile Work at C9061 Batu Gali (LTA) | Pintary Foundations Pte Ltd (Previously known as W Foundations Pte Ltd) | 2015 |
No. | Project Title | Client/ Maincon | Awarded Year |
---|---|---|---|
1 | Bored Pile Work at Linden Drive No 33 – Bukit Timah | Pintary Foundations Pte Ltd (Previously known as W Foundations Pte Ltd) | 2014 |
2 | Bored Pile Work at Commonwealth Avenue (Queenstown) | Ryobi Kiso (S) Pte Ltd | 2014 |
3 | Bored Pile Work at Balestier Road (Novena Planning Area) | Ryobi Kiso (S) Pte Ltd | 2014 |
4 | Bored Pile Work at Jalan Mat Jambol/Pasir Panjang Road | Ryobi Kiso (S) Pte Ltd | 2014 |
5 | Bored Pile Work at Kim Tian Road (B.Merah Planning Area) | Ryobi Kiso (S) Pte Ltd | 2014 |
6 | Bored Pile Work at Sumang Lane/Tampines Expressway (PW40) (LTA) | Ryobi Kiso (S) Pte Ltd | 2014 |
7 | Bored Pile Work at Shenton Way/Marina View/Maxwell Road | Ryobi Kiso (S) Pte Ltd | 2014 |
8 | Bored Pile Work at T206 -Woodlands (LTA) | Pintary Foundations Pte Ltd (Previously known as W Foundations Pte Ltd) | 2014 |
9 | Bored Pile Work at T217 -Hollands * Labour (LTA) | Pintary Foundations Pte Ltd (Previously known as W Foundations Pte Ltd) | 2014 |
10 | Bored Pile Work at 4 Derbyshire Road (Novena Planning Area) | Ryobi Kiso (S) Pte Ltd | 2014 |
11 | Bored Pile Work at Robinson Road/Mccallum Street (Downtown Core Planning Area) | DW Foundation Pte Ltd | 2014 |
12 | Bored Pile Work at Ang Mo Kio Ave 2 | Ryobi Kiso (S) Pte Ltd | 2014 |
13 | Bored Pile Work at 16 Balmoral Road | Star Piling Pte Ltd | 2014 |
14 | Bored Pile Work at Bukit Merah RC53 (HDB) | Ryobi Kiso (S) Pte Ltd | 2014 |
15 | Bored Pile Work at Jurong West N8 C15 (HDB) | Star Piling Pte Ltd | 2014 |
16 | Bored Pile Work at Nanyang Avenue (MOE) | Ryobi Kiso (S) Pte Ltd | 2014 |
17 | Bored Pile Work at C917A (LTA) | DW Foundation Pte Ltd | 2014 |
18 | Bored Pile Work at Yishun N5 C18 (HDB) | Ryobi Kiso (S) Pte Ltd | 2014 |
19 | Bored Pile Work at Spottiswoode Park Road | Ryobi Kiso (S) Pte Ltd | 2014 |
No. | Project Title | Client/ Maincon | Awarded Year |
---|---|---|---|
1 | Bored Pile Work at Jurong West Cental 2 – N6C31 (HDB) | DW Foundation Pte Ltd | 2013 |
2 | Bored Pile Work at Toa Payoh Lor 8 | DW Foundation Pte Ltd | 2013 |
3 | Bored Pile Work at Bukit Batok – N2C22 (HDB) | Ryobi Kiso (S) Pte Ltd | 2013 |
4 | Bored Pile Work at Clementi Ave 3 | Ryobi Kiso (S) Pte Ltd | 2013 |
5 | Bored Pile Work at Novena – Thomson Rd | Ryobi Kiso (S) Pte Ltd | 2013 |
6 | Bored Pile work at Hillview | JF Foundation Pte Ltd | 2013 |
7 | Bored Pile work at Choa Chu Kang N8C2 (HDB) | Fei Kun Piling & Costruction Pte Ltd | 2013 |
8 | Bored Pile work at Punggol Central | ZAP Piling Pte Ltd | 2013 |
9 | Bored Pile work at Tampines Ave 8 | DW Foundation Pte Ltd | 2013 |
10 | Bored Pile Work at Choa Chu Kang N8C8 (HDB) | Fei Kun Piling & Costruction Pte Ltd | 2013 |
11 | Bored Pile Work at Newton – Sarkies Road | DW Foundation Pte Ltd | 2013 |
12 | Bored Pile Work at Novena – Thomson Rd | Ryobi Kiso (S) Pte Ltd | 2013 |
13 | Bored Pile Work at Punggol C31 (HDB) | Yang Jing Piling Pte Ltd | 2013 |
14 | Bored Pile Work at Yishun Ave 9 | DW Foundation Pte Ltd | 2013 |
15 | Bored Pile Work at Hwa Chong Inst.-B.Timah | Ryobi Kiso (S) Pte Ltd | 2013 |
No. | Project Title | Client/ Maincon | Awarded Year |
---|---|---|---|
1 | Bored Pile work at C482 (LTA) | TAK Foundation Pte Ltd | 2012 |
2 | Bored Pile work at Flora Drive | TAK Foundation Pte Ltd | 2012 |
3 | Bored Pile work at Penjuru | Blue Sun Pte Ltd | 2012 |
4 | Bored Pile work at Sentosa | Blue Sun Pte Ltd | 2012 |
5 | Bored Pile work at Tuas | Solid Engineering Pte Ltd | 2012 |
6 | Bored Pile Work at Eunos Ave 3 | DW Foundation Pte Ltd | 2012 |
7 | Bored Pile Work at Benoi | DW Foundation Pte Ltd | 2012 |
8 | Bored Pile Work at Kaki Bukit Ave 4 | KH Foges Pte Ltd | 2012 |
9 | Bored Pile work at Sengkang | Quek & Quek Civil Engineering Pte Ltd | 2012 |
10 | Bored Pile work at 41 Kim Chuan Drive | DS Foundation Pte Ltd | 2012 |
11 | Bored Pile work at Tampines N4C27 (HDB) | KH Foges Pte Ltd | 2012 |
12 | Bored Pile work at Compassvale Walk | KH Foges Pte Ltd | 2012 |
13 | Bored Pile work at Joo Chiat | TAK Foundation Pte Ltd | 2012 |
14 | Bored Pile work at Leedon Heigh | TAK Foundation Pte Ltd | 2012 |
No. | Project Title | Client/ Maincon | Awarded Year |
---|---|---|---|
1 | Bored Pile Work at Jurong West Cental 2 – N6C31 (HDB) | DW Foundation Pte Ltd | 2013 |
2 | Bored Pile Work at Toa Payoh Lor 8 | DW Foundation Pte Ltd | 2013 |
3 | Bored Pile Work at Bukit Batok – N2C22 (HDB) | Ryobi Kiso (S) Pte Ltd | 2013 |
4 | Bored Pile Work at Clementi Ave 3 | Ryobi Kiso (S) Pte Ltd | 2013 |
5 | Bored Pile Work at Novena – Thomson Rd | Ryobi Kiso (S) Pte Ltd | 2013 |
6 | Bored Pile work at Hillview | JF Foundation Pte Ltd | 2013 |
7 | Bored Pile work at Choa Chu Kang N8C2 (HDB) | Fei Kun Piling & Costruction Pte Ltd | 2013 |
8 | Bored Pile work at Punggol Central | ZAP Piling Pte Ltd | 2013 |
9 | Bored Pile work at Tampines Ave 8 | DW Foundation Pte Ltd | 2013 |
10 | Bored Pile Work at Choa Chu Kang N8C8 (HDB) | Fei Kun Piling & Costruction Pte Ltd | 2013 |
11 | Bored Pile Work at Newton – Sarkies Road | DW Foundation Pte Ltd | 2013 |
12 | Bored Pile Work at Novena – Thomson Rd | Ryobi Kiso (S) Pte Ltd | 2013 |
13 | Bored Pile Work at Punggol C31 (HDB) | Yang Jing Piling Pte Ltd | 2013 |
14 | Bored Pile Work at Yishun Ave 9 | DW Foundation Pte Ltd | 2013 |
15 | Bored Pile Work at Hwa Chong Inst.-B.Timah | Ryobi Kiso (S) Pte Ltd | 2013 |